Saibro plans the soil sampling rounds of enhanced rock weathering projects: MRV software for the lead who turns lab sheets into a claim

From your baseline fingerprint, rock analysis, spreading log, rainfall and lab sheets, Saibro's weathering model forecasts every field with a range. It sends the next round's cores where it is least sure, as many as each Unit needs to reach the protocol's power. The claim is then computed from the cores alone.

A noisy round one today means re-coring at several times the density.

Book a call before your next round

or see the price per hectare

Sample project
Sample project, round one is back: four Units clear, three too noisy to call. Units 3, 4 and 6: 340, 470 and 360 more cores; the plan waits for your approval.

Below ten samples a hectare, one field's weathering is hard to tell from noise

10per ha

samples, with over 100 t/ha of rock, for one field's mass balance error to average under 15% (five US fields, 2025)

Noisy fields stay in the claim, since a protocol cannot drop a field for showing no signal. Credits issue at the 30th percentile, so noise costs tonnes.

Example: ten a hectare on 3,000 ha is 30,000 cores a round.

Round two's cores go where the model is least sure, and stop at the protocol's power

Example project, Unit 4 (olive groves, 290 ha): 470 cores for round two, most in the North and East fields. That is under two a hectare, because the protocol sets power per Unit, not per field. A seeded random draw places each core so your verifier can redraw it, and some land on ground the model already knows. Each round's cores refit the model.

The plan stops at 80% power: if the rock weathered as much as round one measured, a round this size detects it four times in five.

Terradot's platform draws on 75,000+ soil samples gathered over five years. Saibro starts from published trials and your cores, so first-season ranges run wide and plans larger.

  • Land-use historyten years a field, read with soil maps; names and parcel numbers are stripped first
  • 90% rangeeach field's weathering estimate, the band nine cores in ten should land in
  • Stays in the claimevery noisy field and every outlier; no plan is sized on the forecast
  • Approve plannothing reaches the field app until you press it
Sample project
Sample plan for Unit 4, olives: North and East have the widest forecast ranges and take 430 cores; South takes 40 in untreated strips E and F. 470 cores in all.

$6 a hectare spread, per reporting period

One round alone is $2 a hectare in the Units it covers; from 10,000 ha a period, $4.50. You pay on hectares, known before the round: the model planning your evidence never earns more from a bigger claim, and a Unit whose cores find little costs the same.

Up to 9,999 ha a period · $6 a hectare

From 10,000 ha a period · $4.50 a hectare

$6

per hectare / reporting period

One round

$2

per ha in the round's Units

One sampling round for the Units you choose, usually the ones round one left too noisy to call.

Round one came back noisy and round two is soon

Book a call

Early access

Reporting period

$6

per ha spread / reporting period

Every round of a reporting period, and the claim at its end with the verifier's files.

We want every round and the claim in one place

Book a call

Portfolio

$4.50

per ha / period, from 10,000 ha

Several projects from 10,000 hectares a period, with the Puro export and our scientist on every plan.

We run more than one project

Book a call
Sampling plan per UnitUnits you chooseEvery UnitEvery Unit, every project
Weathering forecast per fieldYesYesYes
Claim at the protocol's percentileNoYesYes
Verifier's file packNoIsometric v1.2Isometric v1.2 and Puro export
Held-out model checkBefore the planEvery round and periodEvery round and period
Seats for field team and labUnlimitedUnlimitedUnlimited
RoundsOneUp to four a periodUp to four a period, per project
Plan review with our scientistNoOn requestEvery plan
In the plan
  • A plan per Unit: cores per zone, drawn points, reserve list
  • Weathering forecast per field with a 90% range
  • Held-out check before the plan is shown
  • Field app and lab upload, seats unlimited
  • No claim and no file pack
  • Up to four rounds in the period
  • Claim at the protocol's percentile, from cores alone
  • Verifier's file pack for Isometric v1.2
  • Held-out check every round and every period
  • Seats unlimited, verifier read-only
  • Everything in Reporting period, for every project
  • Puro export of plans and lab tables
  • Our scientist reviews every plan with your team
  • All three model families reported each period
  • ERW Data Quarry export

A first plan for up to three of your noisiest Units, on the call, before any contract

No charge for

  • Seats for your field team, lab and verifier
  • Lab sheets read, every round
  • Claims re-run after a protocol update
  • Exports for the registry and the ERW Data Quarry

Example: 2,980 ha is $17,880 for the period, or $1,860 for one round on three noisy Units (930 ha).

For scale, MRV averaged GBP 148 a tonne in Frontier's applicant data. Divide $6 by your own tonnes a hectare.

Round planner · Sample project

UnitSignal after round oneCores in round twoStatus
Unit 1, maize, 520 haClear0No round two needed
Unit 2, maize, 470 haClear0No round two needed
Unit 3, maize, 380 haToo noisy to call340Plan waiting for you
Unit 4, olives, 290 haToo noisy to call470Plan waiting for you
Unit 5, olives, 610 haClear0No round two needed
Unit 6, olives, 260 haToo noisy to call360Approved
Unit 7, maize, 450 haClear0No round two needed

Sample project after round one: every Unit, its signal and its cores for round two

In the example project, four Units came back clear and three need round two

2,980 ha of maize and olive groves in the Ribatejo and the Alentejo, seven Units. Each with its signal after round one, the cores the model proposes for round two and where its plan stands. On a clear Unit, Saibro shows what ten more cores would likely add.

Unit 6 is approved. Units 3 and 4 wait for you.

A plan, not a claim: the cores are still the evidence, and nothing here is credited until they are measured.

Every core in the verifier's files traces back to the point it was drawn at

From the example project: controls matched on the baseline fingerprint, round two at the lab, the check the model must pass each period on fields it never saw, and the files themselves.

Sample project
Sample control and treatment for Unit 4: North field matched with control plot B, East with plot D; South has no close control yet, so more cores are taken.

Controls matched on the baseline fingerprint: pH, inorganic carbon, texture, CEC, base saturation, cations and tracers.

Sample project
Sample round two at the lab: sent, 1,170 cores from Units 3, 4 and 6; back, 690; waiting, 480, due 14 November. Each Unit updates as its sheets come back.

The lab round as it comes back: each Unit's forecast and power update as its sheets arrive.

Sample project
Sample check on fields the model never saw: one field in ten held back from training, nine in ten of their cores must fall in its range. This period: passed.

The model checked against fields it never saw, every reporting period; a failed check switches it off for planning.

Sample project
Sample files for the verifier: sampling plan with power analysis, rarefaction check, lab sheets, model code and theory manual ready; your sign-off waiting.

The files a verifier asks for: sampling plan and power analysis, rarefaction check, lab sheets, and the model's code and theory manual.

Beta since August 2026

Planner and offline field app since August, claim page since October, Puro export due February 2027. Founded in April 2026; taking developers whose next round is still ahead.

saibro.co · Monitoring report, period one · sample project

Sample claim page, period one: 1,186 t at the 30th percentile of the Monte Carlo draws, and the model's forecast of 950 to 1,700 t outside the sum.

Your claim counts soil cores, one of the protocol's two measured routes. The porewater validation check is optional now: porewater sampling cannot yet reliably catch the signal.

A Unit the model was sure of claims what its cores show, even when that is less than it expected.

The claim comes from the cores, at the 30th percentile, with the verifier's files

The example claim page, period one: 1,186 tonnes at the 30th percentile, meaning seven in ten Monte Carlo draws came out higher. Beside it, outside the sum, the model's forecast of 950 to 1,700 t. The verifier's files carry the planning model's code and held-out results, as the draft model module would require.

  • Surfacethe basalt as spread, tonnes a hectare from your log
  • Top 20 cmevery core is cut at least this deep
  • Tillage depth plus 5 to 10 cmwhere tilled-field cores stop
  • Belowdissolved products move on; the registry's losses module counts them

The case against Saibro

Core every Unit again at several times the density and you need no model: the protocol credits only measured removal.

It works, and the protocol rewards it. It also costs up to $200 a tonne in field measurement, a lab queue once samples run to hundreds of thousands a year, and a first delivery pushed later, on removal that already lags spreading by years.

A first core count for your noisiest Units, before round two

Tell us the hectares spread and their crops. They decide which plan fits, and show whether the model has seen ground like yours: maize, olives, vines, cereals and pasture yes, flooded rice no.

  1. Filipa Valadas, our CDO, replies within a business day
  2. Bring your protocol version, the round's date and round one's lab sheets
  3. Leave with a core count per field for up to three noisy Units
  4. The full plan follows within five business days of complete inputs